Oil Terminal Project (Kuching, Sarawak)
Project Details
Client: Senari Synergy & Petron
Status: Ongoing (Started August 2025)
Scope of works
Piping and mechanical construction works for OSBL and ISBL systems, covering fabrication, erection, welding, hydrotesting, and mechanical completion, including pipeline installation and tie-in works.
⦿ Piping Works:
Hydrotesting and mechanical completion
Shop fabrication and welding of piping spools
Fit-up and erection of piping systems
Field welding of piping joints
Pipeline Works:
Installation of 450 meters OSBL pipeline
Fit-up, welding, and tie-in to existing systems
NDT and radiographic testing (RT) coordination
DOSH coordination for statutory requirements
⦿ Mechanical Works:
Installation of pumps and vendor skids
⦿ Overall Dia-Inch:
26,000 dia-inch of piping works









C4 Sarawak Facility Project (Kuching, Sarawak)
Project Details
Client: Dynaciate & Chitose
Status: Ongoing (Started March 2026)
Scope of works
Shop fabrication and site erection of piping systems, including welding of process and utility piping lines.
⦿ Overall Dia-Inch:
5,000 dia-inch of piping works



Past Project Experiences
Shell MLNG FAS Brownfield Conventional Gas Development
Project Details
Duration: April 2024 – October 2024
Scope of works
Piping fabrication and welding of 9,000 dia-inch, including carbon steel, low temp, high temp, stainless steel, and super duplex materials.






Shell Rosmari–Marjoram Sour Gas OGP Project
Project Details
Duration: October 2023 – December 2025
Scope of works
Piping and structural fabrication works (9,500 dia-inch), covering pipe sizes from ¾ inch to 36 inch, including fit-up and welding of carbon steel, low temperature, high temperature, and extra extra strong (XXS) materials.